Our solution
MEGA installed a pilot CO2 separation unit in a container design that can process up to 100 m³/h of raw exhaust gas at the 1 MWe cogeneration unit at the Kameničany Farm. The container design ensures high variability in capacity, allowing installation at both smaller and larger sources. It currently produces 250 kg of CO2 per day.
In the case of installation of a commercial unit, our technology can process exhaust gas in capacities from 1 to 10 t CO2 per day, which corresponds to the output of a 100 kWe to 2 MWe cogeneration unit.